Wallace Eannace sells heating & plumbing equipment through a network of wholesale distributors.
Wallace Eannace provided energy-efficient heating, cooling, and domestic hot water system design assist services and equipment sourcing through its wholesale distribution network to the project team of a large residential development located at 50 East 112th Street In East Harlem, Manhattan To ensure building performance requirements were met and taking Local Law 97 and 154 into account, highly efficient equipment was selected for this project, including but not limited to Lochinvar condensing boilers, Xylem Bell & Gossett pumps, drives, & heat exchangers.
About the Project:
Construction has passed the halfway point on 50 East 112th Street, the tallest tower in the Sendero Verde mixed-use complex in East Harlem, Manhattan. Designed by Handel Architects and developed by Jonathan Rose Companies, L+M Development Partners, and Acacia Network, the 34-story tower represents the second phase of construction and will yield 361 permanently affordable rental units for low- to moderate-income families and the formerly homeless. The edifice is rising directly to the west of the completed first phase, which encompasses a 15-story tower at 60 East 112th Street and a ten-story structure at 75 East 111th Street. The latest tower will span 395,000 square feet, making it the largest affordable Passive House development in the world.
Project Team:
Wallace Eannace | HVAC & Plumbing Consultation and Sourcing
Cosentini Associates | Engineer
Handel Architects | Design Engineer
Jonathan Rose Companies | Developer
L+M Development Partners | Developer
Acacia Network | Developer
About Wallace Eannace
Since 1924 Wallace Eannace has provided energy-efficient HVAC + DHW design, consultative, and equipment sourcing services to Property Managers | Developers | Engineers | and Contractors. Equipment supplied through a network of wholesale distributors. Wallace Eannace’s core services include:
- Product Selection and Sizing
- Equipment Sourcing
- Start-up & Commissioning
- Prefabricated & Modular Solutions
- Extended Warranties
Wallace Eannace brings prefabricated plumbing and HVAC solutions to the North American market through its company Tisdale Manufacturing.
Media Contact: Lisbeth Flores | LF@wea-inc.com | 800.932.4454 or Valeria Medina | vmedina@wea-inc.com | 800.932.4454
Sources: newyorkyimby.com
To learn more about heat pumps and other new to market energy efficient equipment, contact:
Adam Hersh or Darryl Clark | 877.326.6223
Other brands used for energy efficient solutions include: Bell & Gossett , Boilermag, Cemline, Danfoss, Domestic Pump, Fabtek, Flow Conditioning Corp, Galletti, Gould Water Technology, Hoffman Specialty, Lochinvar, McDonnell & Miller, Metraflex, Nupi, Olimpia Splendid, Panasonic, Sentinal Products, Tisdale Manufacturing, Wessels, Zilmet