Wallace Eannace Contracted for Technical Support and HVAC System solutions at JFK International Airport TWA Flight Center Hotel, New York

Wallace Eannace utilizes Lochinvar boilers, domestic water heaters, Xylem’s Bell & Gossett pumps, plate and frame heat exchangers, storage tanks and variable frequency drives.  The company provides solutions that reduced capital equipment costs, project installation timelines, and maximizes long term energy efficiency and uptime. 

The new TWA Hotel is a seven-story split structure that humbly perches behind Eero Saarinen’s Jet Age landmark, the TWA Flight Center, at New York’s John F. Kennedy Airport. The glass-clad building features 512 rooms, a rooftop infinity pool, and a 10,000-square-foot observation deck that looks out over incoming international flights in Jamaica Bay. It’s these things and more that have allowed the revered terminal to reopen as the hotel’s lobby and reception after being closed to the public for over 18 years.

Source: www.archpaper.com

About Wallace Eannace

HVAC AND PLUMBING SOLUTIONS

Supporting the entire project team, from consulting engineer to end user. We provide solutions ensuring the job is completed as intended and to the engineer and owner’s expectations.

95 Years of technical support to the building industry.

WEA-INC.COM