Wallace Eannace utilizes Lochinvar boilers, domestic water heaters, Xylem’s Bell & Gossett pumps, plate and frame heat exchangers, storage tanks and variable frequency drives. The company provides solutions that reduced capital equipment costs, project installation timelines, and maximizes long term energy efficiency and uptime.
37 Blue Slip includes 11 stories above street level on the 30-story, 359-unit mixed-use building, located on the East River waterfront in northern Greenpoint. The tower will encompass 369,482 square feet and rise 340 feet to its pinnacle. 37 Blue Slip is the first high-rise to be built as part of the 5,000-unit Greenpoint Landingmega-development. The ground floor will contain 1,173 square feet of retail space, followed by 359 residential units across the second through 29th floors. The apartments, which will be rentals, should average 811 square feet apiece.
Source: www.yimbynews.com
About Wallace Eannace
HVAC AND PLUMBING SOLUTIONS
Supporting the entire project team, from consulting engineer to end user. We provide solutions ensuring the job is completed as intended and to the engineer and owner’s expectations.
95 Years of technical support to the building industry.WEA-INC.COM