Wallace Eannace Contracted for Technical Support and HVAC System solutions at Riverside Center Building #3, New York

Wallace Eannace utilizes Lochinvar boilers, domestic water heaters, Xylem’s Bell & Gossett pumps, plate and frame heat exchangers, storage tanks and variable frequency drives.  The company provides solutions that reduced capital equipment costs, project installation timelines, and maximizes long term energy efficiency and uptime. 

Riverside Center Building #3 is a 31.5 million square foot, mixed-use mega development on 8-acres of land in the southwestern side of Manhattan’s Upper West Side known as Riverside Center. The five building center will include: 2,500 residential condominium and residential units; 140,000 square feet of neighborhood retail and cinema; a 100,000 square foot K-5 school to support 750 students; a 250-room hotel; 3.2 acres of publicly accessible open space, and 1,500 below-grade parking spaces.

Source:www.tectonicengineering.com

About Wallace Eannace

HVAC AND PLUMBING SOLUTIONS

Supporting the entire project team, from consulting engineer to end user. We provide solutions ensuring the job is completed as intended and to the engineer and owner’s expectations.

95 Years of technical support to the building industry.

WEA-INC.COM