Wallace Eannace Contracted for Technical Support and HVAC System solutions at Greenpoint Landing, Brooklyn

Wallace Eannace utilizes Lochinvar boilers, domestic water heaters, Xylem’s Bell & Gossett pumps, plate and frame heat exchangers, storage tanks and variable frequency drives.  The company provides solutions that reduce capital equipment costs, project installation timelines, and maximizes long term energy efficiency and uptime. 

Developed by Brookfield Properties and the Park Tower Group, the market-rate tower will accommodate 421 apartments according to building permits filed in 2015. Handel Architects is responsible for the design and a new drawing posted on-site shows a factory-inspired exterior of gridded windows atop a brick base. The uppermost floors are recessed and will be wrapped in a curving glass facade. One Blue Slip, Two Blue Slip (aka 41 Blue Slip) will climb 38 floors, 400-feet-tall above the Greenpoint waterfront.

Source: cityrealty.com

About Wallace Eannace –HVAC AND PLUMBING SOLUTIONS
Supporting the entire project team, from consulting engineer to end user. We provide solutions ensuring the job is completed as intended and to the engineer and owner’s expectations.

95 Years of technical support to the building industry.

WEA-INC.COM