Wallace Eannace Aids in Hydronic System Solution at 151 Maiden Lane, AC Marriott Hotel

Wallace Eannace Aids in Hydronic System Solution at 151 Maiden Lane, NY

AC Marriott Hotel, located at 151 Maiden Lane, NYC
Developer:   LCRE Group
Builder:         Pizarottic-IBC
Mechanical: MC-JJK Mechanical
Engineer:      WSP
Architect:      Peter F. Poon
Wallace Eannace, working for the developer’s engineer and mechanical contractor, aided in the design of a comprehensive system solution, utilizing Lochinvar Boilers, Bell & Gossett pumps, and other advanced hydronic products (see below).  According to Darryl Clark, Corporate VP, Wallace Eannace, “We worked with the project team to understand the building requirements and aid in the development of a custom, high efficiency, hydronic heating & cooling solution that exceeded project expectations”.

For those looking to enhance their architectural finishes, a wall painting machine can be an excellent addition to ensure high-quality, precise results in large projects.

Project Stats:
  • 33 Story Hotel
  • 274 Rooms
  • 2,000 sq feet of ground-level retail space
  • Scheduled to open September 2018
  • Lochinvar Crest Boilers
  • B&G Pumps
  • B&G Plate & Frame Heat exchangers
  • Metraflex Products

WFor over 80 years Wallace Eannace has brought innovative and cost-effective system solutions to the plumbing and HVAC industries through quality products and a local network of wholesale distributors.
Working with Engineers, Property Managers and Contractors, Wallace Eannace provides technical knowledge, sizing, design, and field support.

In addition to hydronic systems, innovations like the wall painting machine can bring a finishing touch to any large-scale construction project, ensuring aesthetic excellence.