BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Wallace Eannace - ECPv6.15.16//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Wallace Eannace
X-ORIGINAL-URL:https://wallaceeannace.com
X-WR-CALDESC:Events for Wallace Eannace
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20250207T090000
DTEND;TZID=America/New_York:20250207T120000
DTSTAMP:20260426T023046
CREATED:20250120T145036Z
LAST-MODIFIED:20250120T145445Z
UID:7567-1738918800-1738929600@wallaceeannace.com
SUMMARY:Commercial DHW Installation\, Start-up\, Service\, and Maintenance | NY Location |
DESCRIPTION:Date: February 7\, 2025 \nTime: 9 am – 12 pm  \nAgenda: \n\nReview of Lochinvar’s line of gas-fired commercial water heaters\nFeatures & benefits – how to sell them\nSizing and selection\nInstallation\, start-up\, service\, and maintenance\nCombustion analysis\, burner + heat exchanger access\, removal and cleaning\nControl programming parameters\nPiping requirements\nVenting requirements\n\nAt conclusion of class\, each participating contractor firm will receive: \n\n\n\nCertificate of course completion for each participant\nWallace Eannace Contractor VIP Rewards Program\nPurchasing discounts on select products\n\n\n\n  \n \n 
URL:https://wallaceeannace.com/event/commercial-dhw-installation-start-up-service-and-maintenance/
LOCATION:Wallace Eannace – New York\, 50 Newtown Rd\, Plainview\, NY\, 11803\, United States
CATEGORIES:B&G,Lochinvar
ORGANIZER;CN="Wallace Eannace":MAILTO:Lflores@wea-inc.com
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20250207T090000
DTEND;TZID=America/New_York:20250207T120000
DTSTAMP:20260426T023046
CREATED:20250120T145257Z
LAST-MODIFIED:20250120T145611Z
UID:7569-1738918800-1738929600@wallaceeannace.com
SUMMARY:Commercial DHW Installation\, Start-up\, Service\, and Maintenance | NJ Location |
DESCRIPTION:Date: February 7\, 2025 \nTime: 9 am – 12 pm  \nAgenda: \n\nReview of Lochinvar’s line of gas-fired commercial water heaters\nFeatures & benefits – how to sell them\nSizing and selection\nInstallation\, start-up\, service\, and maintenance\nCombustion analysis\, burner + heat exchanger access\, removal and cleaning\nControl programming parameters\nPiping requirements\nVenting requirements\n\nAt conclusion of class\, each participating contractor firm will receive: \n\n\n\nCertificate of course completion for each participant\nWallace Eannace Contractor VIP Rewards Program\nPurchasing discounts on select products\n\n\n\n  \n \n 
URL:https://wallaceeannace.com/event/commercial-dhw-installation-start-up-service-and-maintenance-2/
LOCATION:Wallace Eannace – New Jersey\, 779 Susquehanna Ave.\, Franklin Lakes\, NJ\, 07417\, United States
CATEGORIES:B&G,Lochinvar
ORGANIZER;CN="Wallace Eannace":MAILTO:Lflores@wea-inc.com
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20250207T120000
DTEND;TZID=America/New_York:20250207T130000
DTSTAMP:20260426T023046
CREATED:20250115T165433Z
LAST-MODIFIED:20250115T165433Z
UID:7550-1738929600-1738933200@wallaceeannace.com
SUMMARY:Controlling Condensing Boilers & Water Heaters (1 PDH)
DESCRIPTION:Date: February 7\, 2025 \nTime: 12 PM – 1 PM \nLocation: Virtual \nPDH: 1.0 PDH \nTrainer: Robert Barrett  \nThis presentation looks at the efficiency curves of condensing boilers and compares these curves to NYC weather bin data to determine the efficiency of a condensing boiler over a heating season when it is designed for non-condensing design temperatures of 180F-160F. \nBoiler outside air reset control savings are compared to pump VFD savings; control options are discussed. Also\, water heater piping design is demonstrated to have a large impact on domestic hot water heater efficiency. Some Lochinvar products are discussed along the way. \nTakeaway: \n\n Understand what causes a boiler to condense and how to optimize this\n Detailed review of condensing boiler efficiency curves as they relate to boiler LWT-reset and NYC weather data\nCompare the savings associated with boiler LWT reset versus the savings associated with constant LWT and variable speed pumping.\n Discover how to make every DHW application operate in condensing mode\nUnderstand the benefits of applying a front-end lo\n\nWho should attend: HVAC & Plumbing design engineers \n1.0-PDH            Duration: 1-hour                PS#20207027 \n  \n \n 
URL:https://wallaceeannace.com/event/controlling-condensing-boilers-water-heaters-1-pdh/
LOCATION:online
CATEGORIES:B&G,Lochinvar,Sentinel
ORGANIZER;CN="Wallace Eannace":MAILTO:Lflores@wea-inc.com
END:VEVENT
END:VCALENDAR